Skip to main content

Who eva works for

Find the work eva can take off your team’s plate.

Explore practical workflows for the people who plan, deliver, and run your projects.

AnswersThe number, the clause, the drawing revision, with its source.
OutputReports, dashboards, reviews and documents produced, not drafted by hand.
ActionWork that runs on a schedule and holds anything sensitive for approval.
JudgementEvery answer written in the language of the person asking.

Find your work

Pick the kind of work you own and see what eva does with it.

Pre construction

Rolling out

Two days of tender review becomes five minutes.

The problem today

Tenders land with a short deadline and the comparable job you priced last year is buried in a folder.

Three workflows to start with

Availability and estimated saving per workflow. Measured results are published separately on the homepage.

  • Tender review and response

    Available now16 hrs→30 minest.

  • Kickoff brief

    Available now8 hrs→18 minest.

  • PQQ and prequalification answers

    Rolling out6 hrs→30 minest.

Example output

Tender response draft

A drafted response using your own winning language, the comparable priced job attached, and every open clause listed for the bid team to answer.

Illustrative sample · fictional data

Systems eva reads

  • On premise file servers
  • Zoho CRM
  • PDF and Excel generation

What changes

  • More bids answered with the same team
  • Your best winning language reused instead of rewritten
  • Every rate traced back to the job it came from

A 30 minute walkthrough of pre construction work with your systems in mind.

Questions people ask here

Preconstruction manager

Bid or no bid decided the same morning the tender lands.

  • “Find the latest tender submission package for the Corve Systems fit out (P26-3290).”
  • “Find our standard exclusions, qualifications and method statement from a recent winning tender so I can reuse them.”
  • “Find our three best case studies for F&B fit outs between AED 5m and 15m completed in the last three years.”
  • “What did we charge per square metre on our last retail fit out of a similar size?”

Estimator

Historical rates and levelled quotes without the digging.

  • “Pull the priced BOQ from a comparable past office fit out and show me the rates for gypsum partitions and ceilings.”
  • “Level these subcontractor quotes into a comparison sheet, normalising units and exclusions.”
  • “Draft a chase email to the subcontractors who have not returned their quotes for the joinery package.”
  • “Which BOQ lines are missing from this bid?”

Bid coordinator

The submission pack assembles itself and flags what expired.

  • “Assemble our prequalification credential pack and flag anything that has expired.”
  • “Which tenders are closing this week, and who owns each?”
  • “Build the compliance matrix for this ITT and mark every clause we have not answered.”

Time is the product. Get yours back

See one workflow run against the systems and project information your team already uses.