Skip to main content

Who eva works for

Find the work eva can take off your team’s plate.

Explore practical workflows for the people who plan, deliver, and run your projects.

AnswersThe number, the clause, the drawing revision, with its source.
OutputReports, dashboards, reviews and documents produced, not drafted by hand.
ActionWork that runs on a schedule and holds anything sensitive for approval.
JudgementEvery answer written in the language of the person asking.

Find your work

Pick the kind of work you own and see what eva does with it.

Design

Rolling out

Twenty years of specification, searchable in construction terms.

The problem today

The precedent you need exists, but only someone who worked on that job knows where it is.

Three workflows to start with

Availability and estimated saving per workflow. Measured results are published separately on the homepage.

  • Reference search across past projects

    Rolling out2 hrs→6 minest.

  • Design schedule status and chase list

    Rolling out3 hrs→12 minest.

  • Materials and finishes schedule extraction

    Rolling out8 hrs→30 minest.

Example output

Finishes and precedent pack

The finishes schedule from the closest past fit out, the joinery and flooring details beside it, and the drawing revision each came from.

Illustrative sample · fictional data

Systems eva reads

  • On premise file servers
  • AutoCAD Architecture
  • Revit 2024 in-app bridge

What changes

  • Design intent reused rather than redrawn
  • Revision confusion caught before it reaches site
  • Product and authority checks answered with a source

A 30 minute walkthrough of design work with your systems in mind.

Questions people ask here

Designer

The precedent from four years ago surfaces in seconds.

  • “What finishes did we specify on the last mall F&B fit out? Pull the finishes schedule and the flooring and joinery details.”
  • “Read the design presentation for the Almaris Group office (P26-3145) and summarise the layout options.”
  • “Look up this supplier's product datasheet and pull the fire rating, IP rating, dimensions and country of origin.”
  • “What are the current UAE authority requirements for this scope of work?”

Design manager

Deliverable status without chasing five consultants.

  • “Which design deliverables are late against the design programme, and who owns each?”
  • “Draft the chase email for the outstanding consultant drawings on Level 4.”
  • “What changed between revision C and revision D of the ceiling layout?”

BIM coordinator

Model, register and drawing set finally agree with each other.

  • “Which drawings in the register have no matching model revision?”
  • “List the clash report items still open after last week's coordination meeting.”
  • “Extract the door and ironmongery schedule from the current model.”

Time is the product. Get yours back

See one workflow run against the systems and project information your team already uses.